![]()
| ||||||||||||
![]() Highway Landscape Architecture |
![]() Ecological Restoration |
|
| |
2004-05 Charleston Homes, Rockwood, ON. Westchester Estates, Brookville, ON. Landscape development concept and detail plan for entrance and streetscape derived from countryside character and protection / re-use of on-site resources.
2004-05 Ministry of Transportation, City of Hamilton. Red Hill Creek Expressway. Landscape Architecture Master Plan for bio-physical impact mitigation, with Dougan & Associates. CAD plans, specifications and contract documents.
2004-05 Charleston Homes, Rockwood, ON. Mill Run subdivision. Landscape plan and specifications for storm water management pond, and review of street tree planting plan for Philips Engineering.
2001-04 Ministry of Transportation of Ontario. W.P. 9-91-00 Hwy 6 (New) between Hwy 403 and Hwy 6 bypass. Sr. Landscape Architect assisting with Preliminary Design and development of Detailed Landscape Design including contract documents and contract administration package.
2001-04 Ministry of Transportation of Ontario. W.P. 629-91-00 Hwy 26 realignment between Collingwood and Wasaga Beach for 15.6 km. Sr. Landscape Architect assisting with revision to Highways Group “A” Environmental Assessment including Aesthetic Assessment, Preliminary Design, and development of Detailed Landscape Design.
1999-01 Newcastle Fellowship Baptist Church. Architectural support for vegetation inventory and assessment, site planning and detailed landscape design.
2000 City of St. Thomas, Mill Creek In-line Combined Sewer Overflow,
Phase II. Landscape
Restoration Plan for tall grass prairie, wet-mesic and upland mesic
meadow
associations, including specifications and construction
supervisory services.
2000 Cape Croker Park - Chippewas of Nawash. Eco-garden celebrating First Nations cultural and natural heritage. Conceptual framework, Master Plan, Detailed Design and construction supervision. Plants provided by Sweet Grass Gardens, Six Nations of the Grand River.
1998-00 City of St. Thomas. Mill
Creek In-line Combined Sewer Overflow, Phase I. Tall Grass Prairie restoration plan, and Environmental
Assessment: Terrestrial Biology Report, Environmental Mitigation Plan
and Landscape Plan with contract documentation.
2000 Trinity Pentecostal Church, Oshawa. Detailed landscape design, tree saving, and specifications. J. David McAuley Architect Inc.
1999-2000 Bissell Park Interpretive Wetlands. Master planning and site design for 4.6 acre facility for
interpretive trail, water quality testing and fisheries management. Elora Centre for Environmental Excellence.
1999-2000 Highway 407 West from QEW Freeman Interchange to Oakville Link interchange. Sr. Landscape Architect in charge of site assessment, conceptual design, detailed design, landscape contract documents and site supervision. SNC Lavalin Engineers and Constructors.
1999 Township of Amabel / Sauble Beach Water and Sewage Works Study. Civil engineering environmental support for preparation of natural and cultural environment component of draft Environmental Study Report. Information collection, mapping, writing, preliminary site selection, impact mitigation.
1999 Amabel Township Water and Sewage Works, Sauble Beach. Environmental Assessment Phase 3 Environmental Inventory and Site Investigations. Natural environment inventory, agency review, preferred site selection, documentation of potential environmental effects and mitigative measures.
1998 Grand River Conservation Authority. Vista Management site implementation supervisory services Phase
II for part implementation of Starky Hill Management Plan.
1998 Ministry of Transportation of Ontario W.P. 220-94-00 Hwy 10 at Hwy 24 in Caledon. Highways Group “B” Environmental Assessment including Environmental inventory, Visual Inventory and Analysis (Aesthetic Assessment), and Landscape Architecture preliminary design plan.
1998-99Mill Creek In-line Combined Sewer Overflow, St. Thomas, Phase I. Environmental Assessment Terrestrial Biology Report, Environmental Mitigation Plan and Landscape Plan with contract documentation.
1997 Ministry of Transportation of Ontario Landscape Architecture planting approval for Fiddler’s Green development adjacent to 403, Ancaster. Review of proposed landscape plans and liaison with MTO.
1997 Gold Park Subdivision, City of Vaughan. Assistance with municipal pathway and storm outfall stabilization
and installation of ravine slope stabilization bioengineering measures.
1994-96Ministry of Transportation of Ontario, Southwest Region, London. Environmental Design and Landscape Architecture. Involved in over 40 WPs associated with landscape restoration and
vegetation management of ministry inhouse and consultant outsourced
highway improvement/development projects. Projects included the twinning of Highway 69 through Port Severn,
all of Highway 401 upgrades between Milton and Cambridge and Woodstock
and London, and many other provincial highway upgrades, bridge
replacements and culvert extensions.
1994 Halton Region Tech Park Storm Channel Naturalization. Halton Region with private interests. Philips Planning and Engineering, Dougan & Associates.
1993-94TH&B Railway Embankment/Ancaster Creek Rail to Trail and
Naturalization Study. Hamilton
Region Conservation Authority, Philips Planning and Engineering, Dougan
& Associates.
1993 Goldie Mill Neighbourhood Association. Visual Assessment of Goldie Mill Neighbourhood.
1993 Hager Creek Revegetation Study. Halton Region Conservation Authority, Philips Planning and
Engineering, Dougan & Associates.
1992 Crombie Royal Commission on the Future of the Toronto Waterfront
/ Waterfront Regeneration Trust. Lake
Ontario Waterfront Trail route selection and report The Waterfront
Trail Northumberland County Port Hope to Trenton coordinator with
Ron Reid: Bobolink Enterprises.
1991 Special Advisor to the Premier, Toronto Waterfront Development,
Duncan M. Allan. Lake
Ontario Waterfront Trail route selection and report The Waterfront
Trail First Steps From Concept to Reality coordinator with Ron Reid:
Bobolink Enterprises and Bob Woodburn: Rethink Inc.
1991 Aldershot GO Station, Tree Protection, Site Inventory and Impact
Analysis, and Tree Protection, Planting Design, Specifications and
General Requirements.
1991 Tree Survey Plan, Oakwood Gardens. Hospitality Hotels Ltd., Niagara Falls, Ontario.
1991-92Landscape Screening and Naturalization, Implementation, Maintenance and Management Guidelines. Walker Brothers Quarries Ltd., Thorold, Ontario. Landscape Screening Study. Walker Brothers Quarries Ltd. Thorold, Ontario.
![]()
2005 Whole Village Landscape Design Charrette. Two-day stakeholder intensive design exercises to determine landscape design around the main healthy building. Near Orangeville, ON.
2002 Speed River Land Trust Action Plan. Project Management Team participant for natural heritage system
mapping and integration with natural area protection strategies.
1994 Couchiching Conservancy Natural Heritage Action Plan. Natural Features Inventory, Landscape Unit Analysis and Natural
Heritage System planning and design. Couchiching Conservancy.
1992 Lake Ontario Greenway and Waterfront Trail Planning Study,
Northumberland County, Project Co-ordinator. Royal Commission on the Future of the Toronto Waterfront/
Waterfront Regeneration Trust, Toronto.
1992 Lake Ontario Greenway Natural Areas Study, Project Co-ordinator. Royal Commission on the Future of the Toronto
Waterfront/Waterfront Regeneration Trust, Toronto.
1991-92Laurel Creek Watershed Master Planning Study. Natural areas connectivity criteria development and application. Ecological Services for Planning, Ltd., Guelph, Ontario.
1991 Greater Toronto Area, Waterfront Trail, Office Co-ordinator. Duncan Allan, Special Advisor to the Premier, Toronto, with Bobolink Enterprises, and Rethink Inc.
![]()
![]() Brownrigg landscape - before |
![]() Brownrigg landscape - after |
![]() English Border |
![]() Natural Swimming Pond |
![]() Herbal Lawn |
2005 Forristal residences, Conestogo, Ontario2005 Watson / Digby residence, Guelph, Ontario
2004 Pengelley residence, Toronto, Ontario
2004 Clayton residence, Guelph, Ontario
2004 Stalker residence, Guelph, Ontario
2003 Crotty residence, Oakville, Ontario
2003 Dupal residence, Mississauga, Ontario
2003 MacKay residence, Oakville, Ontario
2003 Yip/Chan residence, North York, Ontario
2002 Klein residence, North York, Toronto, Ontario
2002-04 Pengelley residence, Etobicoke, Ontario
2002 Pengelley commercial property, Etobicoke, Ontario
2002 Levesque residence, Old Chelsea, Quebec
2002 Elliot residence, MacDonald’s Corners, Ontario
2002 Pedoniquotte residence, Wiarton, Ontario
2001-02Allen residence, Toronto, Ontario
2001-02Turner residence, Acton, Ontario
1998-01Allen residence, Toronto, Ontario
1998-00Dallas residence, Toronto, Ontario
1994-04McNally residence, Guelph, Ontario
1997-00Heitshu residence, Guelph, Ontario
1999 Troper residence, Toronto, Ontario
1999 Luna residence, Guelph, Ontario
1998-99Wilkins residence, Toronto, Ontario
1998 Euteneier residence, Arkell, Ontario
1996-98 Vernon residence, London, Ontario
![]()
C. BRAD PETERSON
ENVIRONMENTAL
MANAGEMENT AND
LANDSCAPE ARCHITECTURE
59 Essex Ave,Guelph, Ontario, N1H 3K9
Telephone 519 763-5260 Fax
519 763-5261
edc@sentex.net www.bradpeterson.ca
![]()
Copyright © 2003-2004 Environmental Design Collaborative |